Vietnam Property Investment Vietnam Property Investment

Hotline: 0777 33 17 88
Icon Collap

Homepage » Projects » Apartment » 9X An Suong

9X An Suong

9X An Suong is an apartment project invested by Hung Thinh Corporation at 380 Song Hanh Street, Hoc Mon Town, Hoc Mon District, Ho Chi Minh City. The 9X An Suong  project has a scale of 9,500m2 with 2 blocks of 25 floors above ground and 1 basement with nearly 800 apartments. 9X An Suong  is a rare project deployed in early 2023 to supply the market with scarce products in the Northwest area of ​​Ho Chi Minh City.

Perspective of 9X An Suong Hoc Mon Apartment Project

Perspective of 9X An Suong Hoc Mon Apartment Project

OVERVIEW OF 9X AN SUONG HOC MON APARTMENT PROJECT

Project name: 9X An Suong
Location: 380 Song Hanh Street, Hoc Mon Town, Hoc Mon District, Ho Chi Minh City
Investor: Hung Thinh Group
Construction unit: Hung Thinh Incons
Project development unit: Hung Thinh Land
Project scale: 9,500 m2
Product Type: Apartment – ​​Officetel – Shophouse
Block Number: 2 Block
Number of floors: 25 floors above ground & 1 basement
Total number of products: 800 products
Apartment area: Studio, 1BR, 2BR, 3BR with area from 36 – 90m2 
Internal facilities: Internal park – Community room – Children’s play area – Restaurant area – Gym & Spa area,…
Selling price: 1.6 Billion/Apartment
9X An Suong Hoc Mon Apartment Project

9X An Suong Hoc Mon Apartment Project

LOCATION OF 9X AN SUONG APARTMENT PROJECT, HOC MON

Location 9X An Suong Apartment Project is located right at the front of 380 Song Hanh Street, Hoc Mon Town, Hoc Mon District, Ho Chi Minh City. 9X An Suong Apartment is located right in the center of Hoc Mon, only 500m from An Suong overpass. From the project, residents can easily move to Tan Son Nhat Airport along Truong Chinh – Cong Hoa road, taking only 15 minutes to travel. The project is near Vinhomes Hoc Mon Urban Area with a scale of ~924 hectares in Tan Thoi Nhi Commune – Hoc Mon District – Ho Chi Minh City.

Location of 9X An Suong Hoc Mon Apartment Project

Location of 9X An Suong Hoc Mon Apartment Project

In addition, An Suong area also has Metro Line No. 2 An Suong – Ben Thanh which is in the process of site clearance. When completed, Metro Line No. 2 will help 9X An Suong residents connect to central districts quickly. The location of 9X An Suong Hoc Mon Project is easily connected to important locations in the area such as:

  • 1 minute to: Nguyen An Khuong Secondary School – Nguyen An Ninh Primary School – Hoc Mon District Administrative Center – Aeon Mall Hoc Mon
  • 3 minutes to: Hoc Mon Market – Hoc Mon Regional General Hospital – Hoc Mon District Medical Center Ho Thi Bi High School
  • 5 minutes to: Hoc Mon Children’s House – Co.op Mart – Hoc Mon Kite Field
  • 7 minutes to: Hoang Phap Pagoda – Ly Thuong Kiet High School – To Ky Secondary School
  • 10 minutes to: An Suong Bus Station – An Suong Crossroads – Xuyen A General Hospital – Galaxy Cinema – Japanese Koi Fish Park – RinRin Park – Hoc Mon Wholesale Market
  • 20 minutes to: Quang Trung Software Park – Tan Son Nhat Golf Course – Aeon Mall Tan Phu
  • 30 minutes to: Tan Son Nhat Airport – District 1 Center
Regional connection of 9X An Suong Hoc Mon Apartment Project

Regional connection of 9X An Suong Hoc Mon Apartment Project

POTENTIAL FOR DEVELOPMENT OF HORMONE AREA

Ho Chi Minh City – Moc Bai Expressway:

Ho Chi Minh City will spend 5,936 billion VND from the 2021-2025 budget to build the Ho Chi Minh City – Moc Bai Expressway. The 9X An Suong Hoc Mon project is located right at the An Suong Intersection connecting via National Highway 22 to the Ho Chi Minh City – Moc Bai Expressway in just 5 minutes. The Ho Chi Minh City – Moc Bai Expressway is 50 km long, with a scale of 4 lanes, and a design speed of 120 km/h. The starting point is the intersection between Provincial Road 15 and Ring Road 3 (Cu Chi District, Ho Chi Minh City); the end point connects National Highway 22 in Ben Cau District (Tay Ninh Province). The nearly 24 km long section through Ho Chi Minh City will be the focal point connecting the Western provinces to the Northwest area of ​​Ho Chi Minh City. 

Ho Chi Minh City - Moc Bai Expressway Route

Ho Chi Minh City – Moc Bai Expressway Route

Aeon Mall Hoc Mon

On April 12, 2022, Aeon Mall Vietnam signed an investment agreement with the People’s Committee of Hoc Mon District at the Investment Promotion Conference in Hoc Mon & Cu Chi District in 2022. The Aeon Mall Hoc Mon Commercial Center project is worth up to 250 million USD ~ 5,750 billion VND.

Location of Aeon Mall Hoc Mon

Location of Aeon Mall Hoc Mon

Aeon Mall Hoc Mon location is 500m from 9x An Suong

Aeon Mall Hoc Mon location is 500m from 9x An Suong

Ring Road 3:

Beltway 3 is one of the national key projects. The project passes through Ho Chi Minh City, Binh Duong, Dong Nai, Long An… with a length of more than 76km, with a total investment of 75,300 billion VND. The section in Ho Chi Minh City is more than 47km long, passing through Thu Duc City, Cu Chi District, Hoc Mon, Binh Chanh… Ho Chi Minh City is determined to basically complete the project by 2025 and put it into full operation by 2026.

Ring Road 3

Ring Road 3

With special importance in connecting traffic infrastructure, promoting regional connectivity, creating space and driving force for socio-economic development of Ho Chi Minh City and the Southern key economic region. On December 29, 2022, the People’s Committee of Thu Duc City (HCMC) handed over 34 hectares of land to the investor to implement component project 1A, Tan Van – Nhon Trach section (phase 1) of the Ho Chi Minh City Ring Road 3 project.

Route connecting Tran Quoc Hoan – Cong Hoa:

On the morning of December 26, 2022, the construction of the TRAN QUOC HOA – CONG HOA CONNECTING ROAD was started, an important project to solve the traffic jam during rush hour. The route is about 4.4 km long, with an expected width of 25-48 m, accommodating 6 lanes. At the same time, 2 underpasses will be built at the intersection of Phan Thuc Duyen – Tran Quoc Hoan and Truong Chinh – Tan Ky Tan Quy.

The Tran Quoc Hoan - Cong Hoa connecting route opens up the blood vessels for the Northwest region.

The Tran Quoc Hoan – Cong Hoa connecting route opens up the blood vessels for the Northwest region.

UTILITIES OF 9X AN SUONG HOC MON APARTMENT PROJECT

Internal facilities of the 9X An Suong Hoc Mon Apartment Project are meticulously cared for by the investor Hung Thinh in the construction of a chain of 5-star high-class facilities for residents here. Possessing diverse internal facilities, helping the lives of 9X An Suong Hoc Mon residents to live extremely comfortably when right inside the project, all the daily shopping needs of residents are met.

Internal Utilities System of 9X An Suong Project

Internal Utilities System of 9X An Suong Project

Internal Utilities System of 9X An Suong Apartment Project includes:

  1. 9X Iconic Zone
  2. Shopping mall
  3. Commercial street
  4. Outdoor parking area
  5. Event Square
  6. The Wealth Waterfall
  7. Relaxation garden
  8. BBQ Garden
  9. Children’s play area
  10. Outdoor gym
  11. Scenic Walk
  12. Park
  13. Multi-purpose sports field
  14. Community vegetable garden
  15. Nursery
  16. 9X Club
  17. Chill Zone
  18. Relaxing garden on high
  19. Multi-level infinity pool
  20. Jacuzzi
  21. Lakeside Resort
  22. Children’s pool
  23. Pool’s Bar
  24. Children’s play area by the lake
Utilities of 9X An Suong Hoc Mon Apartment Project Park

Utilities of 9X An Suong Hoc Mon Apartment Project Park

Right at 9X An Suong Apartment , Hung Thinh Group has arranged full facilities for your family such as: Commercial center – Shopping Shophouse area – Infinity pool area – Garden restaurant & cafe area – Community activity area.

Swimming Pool Utilities 9X An Suong Hoc Mon Apartment Project

Swimming Pool Utilities 9X An Suong Hoc Mon Apartment Project

After a long day of busy work, 9X An Suong residents return home to the “welcome” of the GREEN UTILITY SPACE COMPLEX : waterfall swimming pool, relaxation garden, park, sports area… meeting the needs of enjoying life and relaxing completely.

9X AN SUONG HOC MON APARTMENT PROJECT FLOOR PLAN

9X An Suong Hoc Mon Apartment Project is built on a land area of ​​11,000m2 with 2 blocks of 25-storey apartment buildings with 1000 apartments. 9X An Suong Apartment is designed with 1-2-3 bedrooms, designed to suit a modern green living space and no less classy.

  • Apartments with diverse areas, suitable for all customers.
  • The apartment is modernly designed to suit the tastes of young people.
  • Apartment layout model optimizes usable area, 100% guaranteed
  • All apartments have natural light.
Floor Plan of 1st Floor of 9X An Suong Hoc Mon Apartment Project

 

Floor Plan of 1st Floor of 9X An Suong Hoc Mon Apartment Project

Mat bang Tang 1 Travel Can ho 9X An Suong Hoc Mon - 9X An Suong

 

Floor Plan of 1st Floor of 9X An Suong Hoc Mon Apartment Project

Floor Plan of 2nd Floor of 9X An Suong Hoc Mon Apartment Project

 

Floor Plan of 2nd Floor of 9X An Suong Hoc Mon Apartment Project

Floor Plan of 4th Floor of 9X An Suong Hoc Mon Apartment Project

 

Floor Plan of 4th Floor of 9X An Suong Hoc Mon Apartment Project

Floor Plan of 5th Floor of 9X An Suong Hoc Mon Apartment Project

 

Floor Plan of 5th Floor of 9X An Suong Hoc Mon Apartment Project

Typical Floor Plan of 9X An Suong Hoc Mon Apartment Project

 

Typical Floor Plan of 9X An Suong Hoc Mon Apartment Project

9X An Suong Apartment Design focuses on  optimizing apartment space and emphasizing applicability in apartment design. That is an important core factor that is always the top priority for 9X An Suong investors . Owning their own 9X An Suong house , young residents can FREELY DESIGN THE APARTMENT ACCORDING TO PERSONAL PREFERENCES , decorate the interior in their favorite color scheme or arrange a space for reading, playing the piano… for themselves.

Apartment Design S1 Studio 9X An Suong Hoc Mon

 

Apartment Design S1 Studio 9X An Suong Hoc Mon

Apartment Design A1 1PN 51.34m2 9X An Suong Hoc Mon

 

Apartment Design A1 1PN 51.34m2 9X An Suong Hoc Mon

 
Apartment Design A2 1PN 53.38m2 9X An Suong Hoc Mon

 

Apartment Design A2 1PN 53.38m2 9X An Suong Hoc Mon

 
Apartment Design B1 2PN 70.13m2 9X An Suong Hoc Mon

 

Apartment Design B1 2PN 70.13m2 9X An Suong Hoc Mon

Apartment Design B2 2PN 72.06m2 9X An Suong Hoc Mon

 

Apartment Design B2 2PN 72.06m2 9X An Suong Hoc Mon

Apartment Design B3 2PN 72.22m2 9X An Suong Hoc Mon

 

Apartment Design B3 2PN 72.22m2 9X An Suong Hoc Mon

3 Bedroom Apartment Design 9X An Suong Hoc Mon

 

3 Bedroom Apartment Design 9X An Suong Hoc Mon

9X MODEL APARTMENT AN SUONG HOC MON

Living room 2 Bedroom Apartment 9X An Suong Hoc Mon

 

Living room 2 Bedroom Apartment 9X An Suong Hoc Mon

Master bedroom 2 bedroom apartment 9X An Suong Hoc Mon

 

Master bedroom 2 bedroom apartment 9X An Suong Hoc Mon

Small bedroom 2 bedroom apartment 9X An Suong Hoc Mon

 

Small bedroom 2 bedroom apartment 9X An Suong Hoc Mon

Toilet 2 Bedroom Apartment 9X An Suong Hoc Mon

 

Toilet 2 Bedroom Apartment 9X An Suong Hoc Mon

LIST OF MATERIALS FOR 9X AN SUONG APARTMENT HANDOVER

9X An Suong apartment is handed over by the investor Hung Thinh Group with very high quality with leading brands today such as: VINH TUONG/ KNAUF/ USG BORAL/ TOA/ KOVA/ NIPPON/ AN CUONG/ XINGFA/ INAX/ AMERICAN STANDARD/ CAESAR

Handover materials of 9X An Suong Hoc Mon Apartment

 

Handover materials of 9X An Suong Hoc Mon Apartment

STT CATEGORY MATERIAL BRAND
FLOOR
1 Living room, kitchen Porcelain Tiles VIGLACERA/PRIME/ITALY/AMERICAN/EQUIVALENT
2 Toilet, bathroom Anti-slip semi porcelain tiles VIGLACERA/PRIME/ITALY/AMERICAN/EQUIVALENT
3 Baseboard for living room and kitchen Porcelain Tiles VIGLACERA/PRIME/ITALY/AMERICAN/EQUIVALENT
4 Bedroom Industrial wood, moisture resistant (8mm thick) AN CUONG/ Equivalent
5 Baseboard Bedroom  Film coated plastic NPC/ Equivalent
6 Loggia, drying yard (if any)  Anti-slip semi porcelain tiles  VIGLACERA/PRIME/ITALY/AMERICAN/EQUIVALENT
7 Baseboard of loggia, drying yard (if any) Semi porcelain tiles VIGLACERA/PRIME/ITALY/AMERICAN/EQUIVALENT
WALL
1 Living room, bedroom, kitchen Interior paint TOA/KOVA/NIPPON/Equivalent
2 Loggia, drying yard (if any) Exterior paint TOA/KOVA/NIPPON/Equivalent
3 Toilet, bathroom Ceramic tiles VIGLACERA/PRIME/ITALY/AMERICAN/EQUIVALENT
BARE
1 Living room, bedroom, kitchen Concrete and Plaster  VINH TUONG/ KNAUF/ USG BORAL/ Equivalent
Interior paint TOA/KOVA/NIPPON/Equivalent
2 Toilet, bathroom  Moisture resistant plaster  VINH TUONG/ KNAUF/ USG BORAL/ Equivalent
Interior paint TOA/KOVA/NIPPON/Equivalent
3 Loggia, drying yard (if any)  Concrete, exterior paint  TOA/KOVA/NIPPON/Equivalent
DOORS AND WINDOWS
1 Main door Fireproof door, laminated wood frame, MDF door covered with Melamine AN CUONG/ Equivalent
2 Main door lock  Use magnetic card lock  AVENT SECURITY/ Equivalent
3 Bedroom door  Laminated wood frame, MDF door covered with Melamine  AN CUONG/ Equivalent
4 Lock the door in the apartment    GLORIOUS/ Equivalent
5 Loggia door, Windows, bathroom door Tempered glass, powder coated aluminum frame Glass blanks: VFG/CFG/VIFG/Equivalent
Aluminum profile system: XINGFA (Vietnam)/ YNGHUA/TUNG SHIN/Equivalent
6 Locks, accessories for balcony doors, windows, bathroom doors    DRAHO/ KINLONG/ VICKINI/ Equivalent
SANITARY EQUIPMENT
1 Lavabo  Enamel INAX/ AMERICAN STANDARD/ CAESAR/ Equivalent
2 Lavatory faucet (cold faucet)   INAX/ AMERICAN STANDARD/ CAESAR/ Equivalent
3 Lavabo table top  Natural Granite  
4 Hot and cold shower    INAX/ AMERICAN STANDARD/ CAESAR/ Equivalent
5 Two-piece toilet Enamel INAX/ AMERICAN STANDARD/ CAESAR/ Equivalent
KITCHEN
1 Upper kitchen cabinets  Moisture-proof MFC box, Melamine-coated moisture-proof MFC door  AN CUONG/ Equivalent
2 Lower kitchen cabinets  Moisture-proof MDF box, Melamine-coated moisture-proof MDF door  AN CUONG/ Equivalent
3 Kitchen Counter  Natural Granite  
4 Kitchen wall  Ceramic tile VIGLACERA/ITALY AMERICA/ASIA AMERICA/Equivalent
5 02-compartment sink, Faucet  304 stainless steel sink, chrome-plated metal faucet  MALLOCA/ Equivalent

CONSTRUCTION PROGRESS OF 9X AN SUONG PROJECT

Construction progress of 9X An Suong Project: Currently, the investor has surrounded the project with corrugated iron and cleared the site to serve the project implementation in the coming time. We will continuously update images & flycam of the project construction progress every month to update customers as quickly as possible.

Actual images of 9X An Suong Hoc Mon Apartment Project

 

Actual images of 9X An Suong Hoc Mon Apartment Project

Actual images of 9X An Suong Hoc Mon Apartment Project

 

Actual images of 9X An Suong Hoc Mon Apartment Project

Actual images of 9X An Suong Hoc Mon Apartment Project

 

Actual images of 9X An Suong Hoc Mon Apartment Project

9X AN SUONG HOC MON APARTMENT SALE PRICE

Selling price of 9X An Suong Apartment : 1.6 billion/Apartment

PAYMENT SCHEDULE FOR 9X AN SUONG APARTMENT
(From January 2023)

Unit code: ; Type: 1 bedroom ; Area: 35 m2
Total value excluding VAT: 1,600,000,000
Sales discount 2% 32,000,000
Total Contract Value excluding VAT: 1,568,000,000
Batch Payment term Payment Rate (%) Progressive (%) Total amount
1 Immediately after signing the Deposit Agreement (DAC) 18% 18% 282,240,000
2 Within 1 month from the date of signing the contract 0.5% 18.5%  7,840,000 
3 Within 2 months from the date of signing the contract 0.5% 19.0%  7,840,000 
4 Within 3 months from the date of signing the contract 0.5% 19.5%  7,840,000 
5 Within 4 months from the date of signing the contract 0.5% 20.0%  7,840,000 
6 Within 5 months from the date of signing the contract 0.5% 20.5%  7,840,000 
7 Within 6 months from the date of signing the contract 0.5% 21.0%  7,840,000 
8 Within 7 months from the date of signing the contract 0.5% 21.5%  7,840,000 
9 Within 8 months from the date of signing the contract 0.5% 22.0%  7,840,000 
10 Within 9 months from the date of signing the contract 0.5% 22.5%  7,840,000 
11 Within 10 months from the date of signing the contract 0.5% 23.0%  7,840,000 
12 Within 11 months from the date of signing the contract 0.5% 23.5%  7,840,000 
13 Within 12 months from the date of signing the contract 0.5% 24.0%  7,840,000 
14 Within 13 months from the date of signing the contract 0.5% 24.5%  7,840,000 
15 Within 14 months from the date of signing the contract 0.5% 25.0%  7,840,000 
16 Within 15 months from the date of signing the contract 0.5% 25.5%  7,840,000 
17 Within 16 months from the date of signing the contract 0.5% 26.0%  7,840,000 
18 Within 17 months from the date of signing the contract 0.5% 26.5%  7,840,000 
19 Within 18 months from the date of signing the contract 0.5% 27.0%  7,840,000 
20 Within 19 months from the date of signing the contract 0.5% 27.5%  7,840,000 
21 Within 20 months from the date of signing the contract 0.5% 28.0%  7,840,000 
22 Within 21 months from the date of signing the contract 0.5% 28.5%  7,840,000 
23 Within 22 months from the date of signing the contract 0.5% 29.0%  7,840,000 
24 Within 23 months from the date of signing the contract 0.5% 29.5%  7,840,000 
25 Within 24 months from the date of signing the contract 0.5% 30.0%  7,840,000 
26 Immediately upon signing the Sales Contract (SPA). Expected in the 2nd quarter of 2025 4.0% 34.0%  62,720,000
27 Within 1.5 months from the date of signing the sales contract 3.0% 37.0%  47,040,000 
28 Within 3.0 months from the date of signing the sales contract 3.0% 40.0%  47,040,000 
29 Within 4.5 months from the date of signing the sales contract 3.0% 43.0%  47,040,000 
30 Within 6.0 months from the date of signing the Sales Contract 3.0% 46.0%  47,040,000 
31 Within 7.5 months from the date of signing the sales contract 3.0% 49.0%  47,040,000 
32 Within 9.0 months from the date of signing the sales contract 3.0% 52.0%  47,040,000 
33 Within 10.5 months from the date of signing the sales contract 3.0% 55.0%  47,040,000 
34 Within 12.0 months from the date of signing the Sales Contract 3.0% 58.0%  47,040,000 
35 Within 13.5 months from the date of signing the contract 3.0% 61.0%  47,040,000 
36 Within 15.0 months from the date of signing the Sales Contract 3.0% 64.0%  47,040,000 
37 Within 16.5 months from the date of signing the contract 3.0% 67.0%  47,040,000 
38 Within 18.0 months from the date of signing the Sales Contract 3.0% 70.0%  47,040,000 
39 Within 19.5 months from the date of signing the contract 3.0% 74.0%  47,040,000 
40 Within 21.0 months from the date of signing the Sales Contract 3.0% 78.0%  47,040,000 
41 Within 22.5 months from the date of signing the Sales Contract 3.0% 82.0%  47,040,000 
42 Within 24.0 months from the date of signing the Sales Contract 3.0% 86.0%  47,040,000 
43 Immediately after sending notice of apartment/Shophouse handover. 2 months from the date of signing the sales contract 12.0% 98.0%  188,160,000 
44 Upon receiving notice of GCNSHNO handover 2.0% 100.0%  31,360,000 
TOTAL 100.0%  1,568,000,000 

 

Logo 9x An Suong 1 - 9X An Suong

REGISTRATION FOR CONSULTATION

Dear Customers, please contact the Project Developer directly via the 24/7: CONSULTATION HOTLINE: 0777 33 17 88 or provide your information using the form below. We will get in touch to offer support and consultation as soon as possible. Thank you sincerely for your interest in our projects.

    Partner
    • Hung Thinh Corp
      Hung Thinh Corp
    • Vingroup
      Vingroup
    • Phuc Khang Corp
      Phuc Khang Corp
    • Khang Dien Corp
      Khang Dien Corp
    • Nam Long Group
      Nam Long Group
    • Keppel Land
      Keppel Land
    • MIK Group
      MIK Group
    • Van Thai Land
      Van Thai Land
    • PiGroup
      PiGroup
    • EZLand Việt Nam
      EZLand Việt Nam
    • Tiến Phước Group
      Tien Phuoc Group
    • Bcons Group
      Bcons Group
    • 577 Group
      577 Group
    • Van Xuan Group
      Van Xuan Group
    • Tecco Group
      Tecco Group