Kingdom Ecolake Village is an ecological village with a total area of 4.5 hectares surrounded by pine forests and an ecological lake with a vast, green tea landscape. 100m from Long Thanh – Dau Giay – Lien Khuong highway . Traveling will become extremely convenient. It only takes 2 hours to reach Ho Chi Minh City and 1 hour to reach Da Lat . The perfect choice for tourists and residents when visiting, living and relaxing. Electricity and water lines are installed underground, ensuring safety and protecting the landscape of Bao Loc City.

Kingdom Ecolake Village Bao Loc
KINGDOM ECOLAKE VILLAGE OVERVIEW
- Project name: Kingdom Ecolake Village
- Eco-village location: Ly Thai To extended street, Village 4, Loc Tan, Bao Lam, Lam Dong Province.
- Type: Resort land.
- Scale, area: More than 4.5 hectares including subdivisions: Subdivision A (14 lots), B (8 lots), C (13 lots), D (13 lots), E (14 lots), F (22 lots), G (11 lots), H (14 lots).
- Total lots: 108 lots
- Plot area from: 160 m2 – 1,500 m2
- Standard wastewater treatment system, protecting the natural environment of residents.
- Own a natural ecological lake with unique plants – Pink Algae.
- Famous check-in location of the area.
- Leading the real estate trend, “ Kingdom Ecolake Village ” will also bring high profitability to investors.

Kingdom Ecolake Village Bao Loc Overview
LOCATION OF KINGDOM ECOLAKE VILLAGE
Location Kingdom Ecolake Village is located right on Ly Thai To extended road, Village 4, Loc Tan, Bao Lam, Lam Dong Province. Bao Loc city has a temperate climate all year round of the Southern Central Highlands mountains, this is the place that will become the “Second Home” of each family on weekends to enjoy the cool air, the poetic scenery has not been exploited.

Location of Kingdom Ecolake Village Bao Loc
When the Tan Phu – Bao Loc Expressway is completed in 2025, traveling to Bao Loc from Ho Chi Minh City will become easier and more convenient than ever, taking only 2 hours by car.
Tan Phu – Bao Loc Expressway is expected to be 67km long, with a scale of 4 lanes, the total cost for this phase is about 18,000 billion VND. The project is expected to be put into medium-term investment in 2021 – 2025 under the BOT form and will soon start construction in

External facilities of Kingdom Ecolake Village Bao Loc
KINGDOM ECOLAKE VILLAGE UTILITIES
Kingdom Ecolake Village Bao Loc is an extremely interesting place to come, immerse yourself in nature, escape the hustle and bustle of the city and dust.
Kingdom Ecolake Village is where residents can enjoy a meaningful vacation, with me a cool & fresh atmosphere. Relieve all stress. Dispel fatigue, sadness
This place is not only a place to enjoy or a resort but also an asset that contributes to increasing investment value for customers in the future.

Kingdom Ecolake Village Bao Loc Amenities
CONSTRUCTION PROGRESS OF KINGDOM ECOLAKE VILLAGE
PHASE 1: Construction of traffic system of subdivision 1, landscape renovation (Completed)
PHASE 2: Construction of traffic system in subdivision 2, landscape renovation. Construction of public green tree system (in progress and expected to be completed in January 2021).
PHASE 3: Construction of underground electrical system, water supply and drainage system, wastewater treatment. (In progress and expected to be completed in March 2021)
Construction of color houses and houses of customers purchasing phase 1. (In progress and expected to be completed in March 2021).

Kingdom Ecolake Village Bao Loc Construction Progress